Lithium Americas trumps CATL with $400 million offer to buy Millennial Lithium The offer represents a 22.1% premium over CATL's previous bid of C$377 million. Cecilia Jamasmie | November 1, 2021 | 9:27 am
Ganfeng Lithium lands three-year supply deal with Tesla The Chinese firm will provide battery grade lithium hydroxide products to the electric vehicle maker from 2022 to 2024. Cecilia Jamasmie | November 1, 2021 | 7:34 am
Protests force Peru’s largest copper mine to halt operations Operations at Antamina suspended due to a roadblock set by locals who believe the mine has not lived up to its commitments to support local communities. Cecilia Jamasmie | November 1, 2021 | 3:49 am
Chile copper output sinks to seven-month low The country’s production dropped 6.9% in September to 451,128 tonnes on the back of labour disruptions and falling ore grades. Cecilia Jamasmie | October 29, 2021 | 7:06 am
Anglo American to halve indirect emissions by 2040 Success of its fresh target for Scope 3 emissions reduction depends on the steel sector cutting its own and global policies, Anglo said. Cecilia Jamasmie | October 29, 2021 | 3:44 am
Teck flags costs surge at Quebrada Blanca expansion in Chile While construction at the QB2 copper project is two-thirds done, costs are poised to be up to 5% higher than the original $5.3bn estimate. Cecilia Jamasmie | October 28, 2021 | 9:27 am
Alamos Gold cuts production outlook on Mulatos woes Output at company's founding operation is expected to drop by 15,000 ounces, to between 135,000 to 145,000 ounces. Cecilia Jamasmie | October 28, 2021 | 6:00 am
Rio Tinto sells last Argyle diamonds at record highs Mining ended at Argyle in 2020 after 37 years of production, during which the mine was the source of 90% of the world’s prized pink stones. Cecilia Jamasmie | October 28, 2021 | 3:28 am
Acquisition-hungry Sibanye grabs stake in Australian zinc miner It has bought a 19.99% stake in New Century Resources, which owns a tailings zinc retreatment plant in Queensland. Cecilia Jamasmie | October 27, 2021 | 7:47 am
Equinox breaks ground at one of Canada’s largest gold mines The $1.23bn Greenstone Gold Mines project will produce more than 400,000 ounces of gold annually for the first five years of operations. Cecilia Jamasmie | October 27, 2021 | 5:29 am